Game changer GameBoat 62'

by Bayliss Boatworks 5 Feb 06:29 UTC
GameBoat 62' © Bayliss Boatworks

Second GameBoat hit major milestones in the new year! In late January, our crew installed the main power for GameChanger - two MTU M96L V12 engines, each with 1920 hp. This week, we installed the cabin!

Carlings were placed in the first part of the new year, and the bow deck is complete at month's end. Moving into February, our crews will be removing the cabin jig, preparing the lazarette area for final paint, and beginning to glass the interior!

Specifications:

Start date: May 2017
Length: 62'
Beam: 18'2"
Draft: 5' 1"
Power: Pair of MTU M96L V12 @ 1920 hp each
GenSet: One (1) 20 kw Northern Lights Generator
Fuel Capacity: 1,500 gal.
Water Capacity: 250 gal.
Holding Tank: 80 gal.
Interior Layout: 3 Stateroom / 2 Head / Tackle Room

GameBoat 62' - GameChanger Cabin Install from Bayliss Boatworks on Vimeo.

Related Articles

GameChanger - GameBoat 62'
GameChanger's build crew is now working towards the installation of the teak deck It's all about teak this month! GameChanger's build crew is now working towards the installation of the teak deck, coverboards, and coaming. As for faux teak, GameChanger has plenty. Posted on 3 Jul
Construction update: GameChanger - GameBoat 62'
GameChanger is a bit different from first GameBoat, the 60' Mama C The GameChanger features our most customizable interior option that seeks to meet our owners' unique fishing needs. GameChanger has a three-stateroom/two-head layout, complete with a custom tackle room. Posted on 6 Jun
GameChanger - GameBoat 62' construction update
GameBoat crew is sighting the half round and window line We are in the midst of both upper and lower level cabinetry fabrication on GameChanger - from floors to cabinets to nightstands. Next on the list is installation of head floors, and various cabinetry in the Master stateroom. Posted on 6 May
Bayliss 75' construction updates
Lower level cabinetry buildout has quickly progressed Our crew will continue to finish out the Master with continued buildout on the headboard and valence. The flooring in both the VIP and Crew staterooms have been installed, and the VIP cabinetry is in the process of being fabricated. Posted on 5 May
Blue View - Bayliss 78' construction updates
Installation of the main bulkheads finalized Over the next month, the construction of the salon deck will begin, along with the gyro surround in the lazarette area. Activity in the machine tunnel and pump room will continue, as well. Posted on 4 May
GameChanger - GameBoat 62' construction updates
Mechanically, GameChanger had a lot going on this month Now that her final cockpit mechanical components were placed, our crew was able to frame and install the cockpit deck, as well. On the exterior, buildout began on the flybridge console, and the cabin and bridge are now in fairing. Posted on 8 Apr
Blue View - Bayliss 78' - New construction updates
Blue View's cabin continues to progress Blue View (Bayliss 78') has had a big month, to say the least. After her hull was primed, she was flipped in mid-March, and our crew managed to install her main bulkheads last week. Posted on 4 Apr
New Lor-A-Di - Bayliss 64'
Newest 64' build is very close to her christening date In her final days in Wanchese, Lor-A-Di will be a hub of activity as our crew finishes last minute tasks on the punch list. Wall panels, carpet, and all remaining soft goods are being installed, along with a list of other details. Posted on 4 Feb